BLOG
  • Home
  • |
  • Jump River EV Chargers from Jump River Electric Coop – WI

Jump River EV Chargers from Jump River Electric Coop – WI

call me now
April 16, 2024
Charger TypeRebate TypeControl RequirementRebate AmountApplication Deadline
Standard EV Charging StationPrescriptiveLoad control as defined by cooperativeThe lesser of $400 per charger or 100% of material costWithin 3 months of installation
Smart EV Charging StationPrescriptiveLoad control with integrated meteringThe lesser of $800 per charger or 100% of material costWithin 3 months of installation

Wisconsin
Utility: Jump River Electric Coop – WI
Program Status: Open
End Date: December 31, 2024
Last Checked: April 8, 2024

Rebate Types and Conditions

  1. Standard EV Charging Station
    • Rebate Type: Prescriptive
    • Condition: The charger must be on load control as defined by the cooperative.
    • Rebate Amount: The lesser of $400 per charger or 100% of the material cost.
    • Application Timeline: Must be submitted within 3 months of the installation date.
  2. Smart EV Charging Station
    • Rebate Type: Prescriptive
    • Condition: The charger must be on load control as defined by the cooperative and must include integrated metering. It is also required to use equipment from the program’s approved list.
    • Rebate Amount: The lesser of $800 per charger or 100% of the material cost.
    • Application Timeline: Must be submitted within 3 months of the installation date.
Optimized by Optimole