The New York National Electric Vehicle Infrastructure (NEVI) Program, administered by the New York State Department of Transportation in collaboration with the New York State Energy Research and Development Authority (NYSERDA), is a crucial initiative aimed at expanding the electric vehicle (EV) charging infrastructure across the state. This program is part of the broader national NEVI program, with specific rules tailored to New York’s needs.
Current Status and Timeline
As of September 16, 2024, the program is open for applications. The current round of funding is scheduled as follows:
Event |
Date |
Application Start Date |
September 16, 2024 |
Application End Date |
December 4, 2024 |
Eligibility and Requirements
The NY NEVI Program has specific eligibility criteria and requirements that applicants must meet:
Applicant Eligibility:
- The primary applicant must be the entity that will own the Electric Vehicle Supply Equipment (EVSE).
- The EVSE owner, network operator, or maintenance provider must demonstrate experience through a long-term service agreement of at least 10 DC Fast Chargers (DCFC) for at least 2 years.
Site and Equipment Requirements:
- Eligible sites are located along Alternative Fuel Corridors (AFCs) north of and including I-84.
- Each site must accommodate simultaneous charging for at least four vehicles at a minimum of 150 kW.
- Total site delivery capacity must be 600 kW or more.
- All EVSE ports must have CCS connectors.
- Proposers are strongly encouraged to also offer J3400 connectors on some or all EVSE.
General NEVI Requirements:
- Chargers must be within one travel mile of designated EV corridors.
- Charging stations should be no more than 50 miles apart along these corridors.
- Charger ports must be compatible with all EVs sold in the U.S.
- Projects must provide information on publicly available EV charging infrastructure.
- All projects must adhere to Buy America standards.
Funding Details
The NY NEVI Program offers substantial financial support for qualifying projects:
Grant Type |
Maximum Funding |
Percentage of Project Cost |
NEVI Grant |
Up to $1,536,000 per site |
Up to 80% of Project Cost |
Additional Funding Notes:
- The top 3 sites in each subregion will be awarded funding.
- The grant is designed as a custom rebate, allowing flexibility for various project designs within the specified parameters.
Application Process
While specific details of the application process are not provided in the given information, potential applicants should prepare to demonstrate how their proposed projects meet all the stated requirements. This likely includes:
- Detailed plans for charger installations and site configurations
- Evidence of experience in EVSE operation and maintenance
- Location specifics, including proximity to designated EV corridors
- Project budget and funding breakdown
- Technical specifications of proposed charging equipment
- Plans for providing information on publicly available EV charging infrastructure
- Strategies for adhering to Buy America standards
Importance of the Program
The NY NEVI Program plays a critical role in New York’s transition to electric vehicles. By strategically placing high-powered charging stations along key corridors, the program aims to:
- Reduce range anxiety for EV drivers
- Encourage more New Yorkers to consider electric vehicles
- Support the state’s efforts to reduce transportation-related emissions
- Boost local economies by attracting EV drivers to various communities across New York
- Create a robust and reliable charging network along major travel routes
Additional Resources
For more detailed information about the NY NEVI Program, interested parties can visit the main NEVI information page provided by NYSERDA.
The New York NEVI Program represents a significant opportunity for businesses and organizations to contribute to the state’s EV infrastructure. With its focus on high-powered, strategically located charging stations, this program is set to play a crucial role in New York’s sustainable transportation future. Interested parties are encouraged to review the detailed requirements, consult the official program documentation, and prepare comprehensive applications to participate in this transformative initiative.