Plug-in Austin by Austin Energy – TX EV Charger Rebate

call me now
Program Notes:
Limit 1 application per address.
Rebate Processing Notes:
Pre-approval is not required. Application must be received within 180 days of installation or permit inspection.
Program Geography:
Utility
Program Status:

Open

Start Date:
08/15/2023
Equipment Rebate Type Requirements Rebate Amount
DCF Fast Chargers Prescriptive Maximum 6 stations per year per address
Must be Open Charge Point Protocol (OCCP) compliant.
Must use equipment on program’s approved list.
Lesser of
$5,000 per Station
OR
50% of Project Cost
Level 2 Charger Prescriptive Maximum 6 stations per year per address
Must be Open Charge Point Protocol (OCCP) compliant.
Must use equipment on program’s approved list.
Lesser of
$3,000 per Station
OR
50% of Project Cost
Level 1 Charger Prescriptive Must be a dedicated for EV
Maximum 6 stations per year per address.
Must use equipment on program’s approved list.
Lesser of
$700 per Station
OR
50% of Project Cost
Residential Level 2 Charger – OCPP Compliant Prescriptive There is a limit of one rebate per electric vehicle lease or purchase
Must use equipment on program’s approved list.
Lesser of
$1,200 per Charger
OR
50% of Project Cost
Residential Level 2 Charger – Non-OCPP Compliant Prescriptive There is a limit of one rebate per electric vehicle lease or purchase
Must use equipment on program’s approved list.
Lesser of
$900 per Charger
OR
50% of Project Cost