BLOG
  • Home
  • |
  • Richland WI EV Chargers by Richland Electric Coop – WI

Richland WI EV Chargers by Richland Electric Coop – WI

call me now
April 16, 2024
Rebate TypeRequirementsRebate Amount
EV Charging Station Rebate (Prescriptive)The charger must be on load control as defined by the cooperative.The lesser of $400 per charger or 100% of Material Cost.
Smart EV Charging Station Rebate (Prescriptive)The charger must be on load control as defined by the cooperative with integrated metering.The lesser of $800 per charger or 100% of Material Cost.

Wisconsin

Program Details:

  • Program Geography: Utility.
  • Program Status: Open.
  • End Date: December 31, 2024.
  1. Pre-Approval and Application:
    • Pre-approval is not required for the rebate.
    • The application must be submitted within 3 months of the installation date of the EV charger.
  2. Program Geography:
    • The program is available within the utility service area of Richland Electric Coop.
  3. Program Status and End Date:
    • The program is currently open.
    • The end date for the program is December 31, 2024.

Rebate Types:

1. EV Charging Station Rebate (Prescriptive):

  • Requirements:
    • The EV charger must be on load control as defined by the cooperative.
  • Rebate Amount:
    • The rebate amount is the lesser of:
      • $400 per charger.
      • 100% of Material Cost.

2. Smart EV Charging Station Rebate (Prescriptive):

  • Requirements:
    • The smart EV charger must be on load control as defined by the cooperative.
    • The charger must have integrated metering capabilities.
  • Rebate Amount:
    • The rebate amount is the lesser of:
      • $800 per charger.
      • 100% of Material Cost.
Optimized by Optimole