Ameren EV Chargers – MO from Ameren – MO
Ameren Missouri offers an Electric Vehicle (EV) Charging Program to support the adoption of electric vehicles in their service area. This program provides rebates for the installation of Level 2 and DC Fast Charging (DCFC) stations for various types of properties and businesses.
Important Details
- Eligibility: Condominiums are not eligible for the program.
- Funding Limit: Maximum $500,000 per affiliated businesses.
- Pre-approval: Required before installation.
- Program Geography: Limited to Ameren Missouri’s utility service area.
- Program Status: The rebate program is currently out of funding.
- End Date: September 30, 2024 (Note: Funds may run out sooner)
- Last Checked: October 3, 2024
Program History
Date | Update |
---|---|
October 3, 2024 | The rebate program is now closed. |
March 20, 2024 | The program added a deadline of September 30, 2024. Funds may run out sooner. |
Rebate Details
Level 2 Charger
Criteria | Details |
---|---|
Rebate Type | Prescriptive |
Maximum Amperage | 40 amps |
Station Limits |
|
Rebate Amount | Lesser of:
|
DC Fast Charger (DCFC)
Criteria | Details |
---|---|
Rebate Type | Prescriptive |
Power Rating |
|
Station Limits | Maximum of 2 stations |
Workplace Eligibility | Only business fleets are eligible at workplaces |
Rebate Amount | Lesser of:
|
Additional Information
The Ameren EV Chargers – MO program aims to support the growing electric vehicle infrastructure in Missouri. By offering substantial rebates for both Level 2 and DC Fast Chargers, Ameren is encouraging businesses, workplaces, and public locations to install charging stations.
Key points to consider:
- The program’s end date of September 30, 2024, indicates a limited-time opportunity for businesses to take advantage of these rebates.
- The differentiation between workplace, multifamily, and public location installations for Level 2 chargers allows for targeted infrastructure development.
- The inclusion of DCFC options, especially for business fleets, supports the adoption of fast-charging technology.
- The rebate structure, offering either a fixed amount per port or a percentage of the project cost, provides flexibility for various project sizes and budgets.
Interested parties should note that while the program currently has an end date, funding may run out before this date. Therefore, it’s advisable to submit applications as early as possible to ensure consideration for the rebates.