  1. Program Overview:
    • Geographical Eligibility: Only available to customers within the service area of Bayfield Electric Cooperative.
    • Program Status: The program is active and accepting applications.
  2. Rebate Types:
    • Standard EV Charging Station:
      • Rebate Amount: $400 or 100% of the material cost, whichever is lesser.
      • Condition: The charging station must be connected to the cooperative’s load control system. This system allows the cooperative to manage energy use during peak times, enhancing grid reliability.
    • Smart EV Charging Station:
      • Rebate Amount: $800 or 100% of the material cost, whichever is lesser.
      • Condition: Besides being on load control, these stations must include integrated metering, which provides detailed data on electricity usage and can help in optimizing energy consumption.
  3. Submission Timeline:
    • Application Deadline: Applications should be submitted within 3 months of the installation date. This ensures that participants are reimbursed in a timely manner and that the installations are fresh and comply with current standards.
  4. End Date:
    • Closure: Scheduled for December 31, 2024, but it’s critical to apply early as the program could close sooner if funding is exhausted.
Charger Type Rebate Amount Condition Material Cost Coverage Application Deadline
Standard EV Charging Station $400 Must be on load control Up to 100% Within 3 months of installation
Smart EV Charging Station $800 On load control with integrated metering Up to 100% Within 3 months of installation