Jump River EV Chargers from Jump River Electric Coop – WI
Charger Type | Rebate Type | Control Requirement | Rebate Amount | Application Deadline |
---|---|---|---|---|
Standard EV Charging Station | Prescriptive | Load control as defined by cooperative | The lesser of $400 per charger or 100% of material cost | Within 3 months of installation |
Smart EV Charging Station | Prescriptive | Load control with integrated metering | The lesser of $800 per charger or 100% of material cost | Within 3 months of installation |
Utility: Jump River Electric Coop – WI
Program Status: Open
End Date: December 31, 2024
Last Checked: April 8, 2024
Rebate Types and Conditions
- Standard EV Charging Station
- Rebate Type: Prescriptive
- Condition: The charger must be on load control as defined by the cooperative.
- Rebate Amount: The lesser of $400 per charger or 100% of the material cost.
- Application Timeline: Must be submitted within 3 months of the installation date.
- Smart EV Charging Station
- Rebate Type: Prescriptive
- Condition: The charger must be on load control as defined by the cooperative and must include integrated metering. It is also required to use equipment from the program’s approved list.
- Rebate Amount: The lesser of $800 per charger or 100% of the material cost.
- Application Timeline: Must be submitted within 3 months of the installation date.