KY NEVI Program from Kentucky Transportation Cabinet
The Kentucky Transportation Cabinet (KYTC) is leading the charge in electric vehicle (EV) infrastructure development through its National Electric Vehicle Infrastructure (NEVI) program. This initiative aims to create a robust network of EV charging stations across the Bluegrass State, making electric vehicle travel more accessible and convenient for residents and visitors alike.
Program Overview
Aspect | Details |
---|---|
Geography | Statewide |
Status | Open (3rd RFP) |
Current RFP Period | September 17, 2024 – October 21, 2024 |
Program Type | NEVI Grant (Competitive Bid) |
Program History and Evolution
The KY NEVI program has seen multiple rounds of funding opportunities:
- 1st RFP: June 15, 2023 – August 24, 2023
- 2nd RFP: February 19, 2024 – April 19, 2024
- 3rd RFP: September 17, 2024 – October 21, 2024 (Current)
Key Requirements
The KY NEVI program adheres to federal NEVI guidelines while incorporating state-specific requirements:
- Chargers must be located within one travel mile of designated EV corridors
- Charging stations should be no more than 50 miles apart along these corridors
- Charger ports must be compatible with all EVs sold in the United States
- Projects must provide information on publicly available EV charging infrastructure
- All equipment and installation must follow Buy America standards
Specific Program Details
Requirement | Description |
---|---|
Charger Specifications | Minimum of 4 DCFC chargers, each capable of 150kW output |
Availability | 24/7 public access required |
Connector Types | Must include NACS connectors in addition to standard DCFC connectors |
Current RFP Goal | 12 additional charging stations |
Funding Structure
The KY NEVI program offers a substantial rebate of up to 80% of the total project cost. This funding is distributed across different project milestones:
Milestone | Percentage of Funding |
---|---|
Executed Purchase Order | 25% |
After Commissioning | 25% |
Final Completion | 30% |
Operations and Maintenance | 20% (paid in equal annual increments over 5 years) |
Eligible Locations
A comprehensive list of eligible corridors and exits is provided in the Request for Proposals (RFP) document. Potential applicants are encouraged to review this list carefully to ensure their proposed locations align with the program’s geographic requirements.
Application Process
The KY NEVI program operates on a competitive bid basis. Interested parties should:
- Review the current RFP thoroughly
- Assess potential locations against the provided eligibility map
- Prepare a comprehensive proposal addressing all program requirements
- Submit the application within the specified timeframe (currently September 17, 2024 – October 21, 2024)
Looking Ahead
As Kentucky continues to expand its EV charging network, the KY NEVI program plays a crucial role in shaping the state’s electric transportation future. By strategically placing high-powered charging stations along key corridors, Kentucky is paving the way for increased EV adoption and supporting a cleaner, more sustainable transportation ecosystem.
For the most up-to-date information on the KY NEVI program, including detailed eligibility criteria and application procedures, interested parties should consult the official Kentucky Transportation Cabinet website or contact the program administrators directly.