Richland WI EV Chargers by Richland Electric Coop – WI
Rebate Type | Requirements | Rebate Amount |
---|---|---|
EV Charging Station Rebate (Prescriptive) | The charger must be on load control as defined by the cooperative. | The lesser of $400 per charger or 100% of Material Cost. |
Smart EV Charging Station Rebate (Prescriptive) | The charger must be on load control as defined by the cooperative with integrated metering. | The lesser of $800 per charger or 100% of Material Cost. |
Program Details:
- Program Geography: Utility.
- Program Status: Open.
- End Date: December 31, 2024.
- Pre-Approval and Application:
- Pre-approval is not required for the rebate.
- The application must be submitted within 3 months of the installation date of the EV charger.
- Program Geography:
- The program is available within the utility service area of Richland Electric Coop.
- Program Status and End Date:
- The program is currently open.
- The end date for the program is December 31, 2024.
Rebate Types:
1. EV Charging Station Rebate (Prescriptive):
- Requirements:
- The EV charger must be on load control as defined by the cooperative.
- Rebate Amount:
- The rebate amount is the lesser of:
- $400 per charger.
- 100% of Material Cost.
- The rebate amount is the lesser of:
2. Smart EV Charging Station Rebate (Prescriptive):
- Requirements:
- The smart EV charger must be on load control as defined by the cooperative.
- The charger must have integrated metering capabilities.
- Rebate Amount:
- The rebate amount is the lesser of:
- $800 per charger.
- 100% of Material Cost.
- The rebate amount is the lesser of: